We have historic tiles in two Play Areas and significant sidewalks in the Park, of which were in poor condition when we performed our assessment in 2017.
Plans
- South Play Area to be re-tiled when COVID-19 restrictions are lifted.
- Sidewalk rehabilitation will require a significant fundraising effort.
- Stormwater management features could be considered as part of the major sidewalk rehabilitation.
Accomplishments
2020
- South Play Area re-tiling was delayed due to COVID restrictions.
2019
- North Play Area was re-tiled in Summer 2019.