Sidewalks and Tiles

Tiles in the Activity Wells

We have historic tiles in two Play Areas and significant sidewalks in the Park, of which were in poor condition when we performed our assessment in 2017.

Plans

  • South Play Area to be re-tiled in 2019/2020.
  • Sidewalk rehabilitation will require a significant fundraising effort.
  • Stormwater management features could be considered as part of the major sidewalk rehabilitation.

Accomplishments

2019

  • North Play Area was re-tiled in Summer 2019.